Customization: | Available |
---|---|
Type: | Stainless Steel Sheets |
Standard: | ASTM, AISI, GB, JIS, DIN, EN |
Still deciding? Get samples of US$ 0.1/kg
Request Sample
|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
AISI | RU | EN | C | Si | Mn | P | S | Ni | Cr | Mo | N | Other |
420J1 | 20X13 | 1.4021 | 0.16-0.25 | 1.00 | 1.00 | 0.040 | 0.030 | 0.60 | 12.00-14.00 | |||
420J2 | 30X13 | 1.4028 | 0.26-0.35 | 1.00 | 1.00 | 0.040 | 0.030 | 0.60 | 12.00-14.00 |
AISI | RU | EN | T.S. min | Y.S. min | EL min% | HARDNESS( max) | ||
Mpa | Mpa | 50mm | HBW | HRB | HV | |||
420J1 | 20X13 | 1.4021 | 528 | 225 | 18 | 223 | 97 | 234 |
420J2 | 30X13 | 1.4028 | 540 | 225 | 18 | 235 | 99 | 247 |
Tensile strength is the main performance of the material after quenching. Generally, the tensile strength of 420J2 after quenching can reach more than 1400, and the unquenched material is about 900.
The anti-rust performance of martensitic steel after quenching is better than that of unquenched materials, mainly because after the carbon chromium decomposes, the carbon dissolves in the matrix, and the chromium element strengthens the anti-rust properties. Chromium is an element that plays a decisive role in rust prevention in 400 series stainless steel. Due to the presence of carbon chromium compounds before quenching, the actual chromium element that is responsible for rust prevention is about 2% lower than the actual content. After quenching, the chromium element content can increase by 1%. above.
1 | Q: Can you provide the samples and how long can i get samples? A:Yes,we could offer the samples for free charge but the cost of freight be paid by customers.And generally speaking ,customized samples will take about 7-10 days. |
2 | Q: What is the MOQ about products? A:Flexible quantity according to your need. |
3 | Q: How long can make the delivery? A:For stock products,can make shipments 7-10 days after receiving desipot or L/C;For products need new production for common materials ,make shipments in 15-25 days;For products need new production for special and rare materials, usually need 30-40 days to make shipment. |
4 | Q: How does your company control quality? A:According to the standard for production.And we can also accept the third-party inspection. |
5 | Q: What is your payment terms? A: Payment<=1000USD, 100% in advance. Payment>=1000USD, 30% T/T in advance ,balance before shippment or 100% Irrevocable L/C at sight |